top of page

Estimating the Time Required to Transition Aircraft Fleets to New Scheduled Maintenance Intervals (1979) By I. K. Cohen, Eugene C. Poggio

 

Typically, decisionmakers are called upon to make decisions on aircraft inspection intervals on the basis of very limited analytic information. Under such circumstances, decisionmakers are understandably concerned about the risks incurred in extending inspection intervals. This Note presents in some detail a discussion of the phenomenon that although an immediate change is made in inspection intervals, it takes a considerable period of time for the fleet to transition to the changed interval. The slow fleet maturation may provide considerable opportunity to monitor and control the condition of the fleet during the transition period. Thus, in the case of extending inspection intervals, risk is reduced and spread over time while the payoff for the change is immediate.

 

  • Soft Cover
  • 29 pages
  • In Good Condition

Estimating The Time Required To Transition Airfleet Fleets (1979) By I. K. Cohen

AU$19.99價格
數量
只剩 1 件庫存
    尚無評論分享您的意見。 成為第一個發表評論的人。
    Tally Ho Chap ©
    ©版權所有

    相關產品

    bottom of page